Case Studies

Lever was approached to design a replacement transfer chute to deliver material from a conveyor to a reversible receiving belt below.

Case Study - Discrete Element Modelling-

Lever was engaged to provide engineering design services for the removal and installation of a temporary steelwork frame for South32's drum separator.

Case Study - Temp Works-01.jpg

Lever was engaged to provide strain gauging installation, data collection and data analysis of three 250 tonne excavators.

Case Study - Strain Gauging-01.jpg

Lever was engaged by Brisbane City Council to design a replacement diverter chute at one of their Asphalt plants.

BCC Diverter-01.jpg

Our Mechanical Engineers were approached to design and certify a 100 tonne winch to be used with an underground mine extraction device (MED).

Case Study - 100T Underground Rigging Wi
MaxTank Certification

Lever was engaged to review and certify the MaxTank for the reduced capacity used in the manufactured structures and additional design modifications.

Case Study - MaxTank-01.jpg

Lever was engaged to design an updated version of a Mobicon machine to include various manufacturability and usability improvements.

Case Study - Mobicon-01.jpg