Fraser Osborn, now Fraser-Lever supported Cape Flattery Silica across port, materials handling, processing and slurry transport infrastructure, including wharf engineering, berthing facilities, a silica processing plant and a 2 Mtpa slurry pipeline and pumping system.

Capabilities demonstrated

Sectors

Ports & bulk export

Delivery Approach

  • Existing operations & brownfield upgrades
  • Lifecycle asset maintenance & performance

Service Types

  • Mechanical engineering
  • Structural engineering
  • Asset integrity & reliability engineering

Asset Types

  • Bulk materials handling systems
  • Conveyors & transfer systems
  • Industrial structures & balance-of-plant-assets
  • Water & services

Project overview

Cape Flattery Silica Mines exported approximately 2 Mtpa of high-quality silica through an integrated materials handling system comprising a bucket-wheel reclaimer, approximately 5 km of overland conveyor, wharf and ship loader.

The conveyor system had a capacity of approximately 2,000 tph and comprised five conveyors feeding a slinger at the telescopic end of the ship-loader boom.

Fraser-Lever subsequently supported additional processing and slurry-transport infrastructure at the site.

Fraser-Lever’s role

The recorded scope included:

  • Review of wharf construction methodology
  • Review of piling methodology
  • Structural audit
  • Review of preventive maintenance procedures
  • Design and specification of berthing dolphins
  • Design of a land-backed sheet-pile wharf for service vessels up to 2,000 tonnes
  • Design changes to meet Australian Standards and access requirements
  • Design of a new 800 tph silica processing plant
  • Design of a 2 Mtpa raw silica slurry transport pipeline
  • Slurry mixing and storage
  • Primary and secondary slurry pumping stations
  • Approximately 6 km slurry pipeline
  • Return-water pipeline and pumping system

The engineering challenge

The infrastructure combined marine, bulk materials handling, processing and slurry-transport requirements within an operating silica mine and export facility. The challenge was integrating existing wharf, conveying and ship-loading infrastructure with new processing, pumping and pipeline systems while maintaining a practical, coordinated approach across the operation.

Engineering in practice

The original export system moved silica through reclaim, overland conveying and ship-loading infrastructure.

For the later slurry transport project, Fraser-Lever developed an integrated system covering slurry mixing and storage, primary and secondary pumping, a 6 km slurry pipeline and return-water infrastructure.

Project outcomes

The engineering supported an export operation handling approximately 2 Mtpa of silica and subsequent development of additional processing and slurry-transport infrastructure.

The land-backed wharf designed by Fraser-Lever was later used to supply materials and equipment for the new processing plant.